The Test Run can be managed using the following options:

  • Manage Test Runs
    • Create
      • The user is presented a dialogue box where all the associated attributes can be configured.

    • Associate/ Disassociate Test Cases
      • In the current view, user can choose associate or disassociate Test Cases with the current Test Run.
      • Click on "Associate" button. System will open up a panel and provide options to link/ unlink Test Cases to a specific Test Run.

      • Test cases can also be associated with a Test Run from the "Test Cases" view in RMsis.
        • For RMsis 1.8.8.4-r310 and later versions,
          • In order to associate test case(s) with a test run from the Test Cases view, user can select the test case(s) and then click on "More operations" > "Associate Test Run" 
          • Select the Test Run with which test cases needs to be associated.
        • For RMsis 1.8.8.2-r304 and previous versions
          • In order to associate test case(s) with a test run from the Test Cases view, user can select the test case(s) and then click on "Associate TR" button.
    • Commit
      • The currently selected Test Run is committed.
      • In case some of the associated Test Cases are not in a committed state, the system will provide an option to the user to commit all the associated Test Cases.
    • UnCommit
    • Import
      • When a user decides to import the status through a CSV import; status of test cases with matching External-Id's OR Internal ID's is updated. Broadly the status is imported in three steps:
        • Choose the file containing the Test Case Id and Status.
        • Map the ID fields and choose either Internal ID OR External ID
        • Map the values.
    • Export
      • The currently selected Test Run can be exported in CSV or PDF format.
    • Delete
      • The currently selected Test Run is deleted, if it is still in editable state.
    • Create Copy
      • A new copy of the Test Run will be created and it will contain links to all Test Cases referenced in the current Test Run.
      • System will prompt user to provide name for the same.
      • User will also have an option to associate it with another release.
      • In order to create a copy of a test run,
        • Click on "More" dropdown menu.
        • Click on "Create Copy".
        • A panel will open up. 
        • Enter the details of the Test Run like Name, Description, Build/ Version Details, Environment, Start Date, End Date, Associated with Release.
        • Two checkboxes "From Filter:" and "Copy Status:" will be present at the bottom of this panel. (Available from RMsis 1.8.9.2 and later versions)
          • From Filter:
            • Select/ Check the "From Filter:" check box if you have applied a filter on the original test run and you want only those test cases to be associated with new test run which were present in the filter.
            • If you do not select/ check this check box, all the test cases present in original test run will be associated with new test run.
          • Copy Status:
            • Select/ Check this checkbox if you want to copy the status of test cases from original test run to the new test run.
  • View
    • Status Summary ( available from RMsis 1.8.8.4-r310 and later versions)
      • A summary of status of the test cases associated with selected Test Run is displayed.
    • Test Cases associated with the chosen Test Run
      • This is the default view.
      • Specific filters will be provided in the Table Headers, so as to help the user to quickly access relevant information.
    • Test Run
      • System provides a list, from which user can select the desired Test Run.

  • View Details : This shows the details associated with the Test Run.

  • Edit Details : This provides an option to edit the details of a Test Run.

 